Document Controller - Data Center Construction Job at Manpower Engineering, Phoenix, AZ

  • Manpower Engineering
  • Phoenix, AZ

Job Description

Our client, a leading global technology company supporting mission-critical data center construction projects, is seeking a Document Controller to join their team. As a Document Controller, you will be part of the Construction Project Team supporting Construction Managers, Project Engineers, General Contractors, subcontractors, design consultants, commissioning teams, vendors, and Operations. The ideal candidate will have strong attention to detail, excellent organizational skills, and strong written and verbal communication skills which will align successfully in the organization.

Job Title: Document Controller - Data Center Construction
Location: Phoenix, AZ
Pay Range: $64.71 - $69.71/hour

What's the Job?

  • Maintain organized and traceable project records, including drawings, submittals, RFIs, reports, permits, closeout records, and turnover documentation throughout the construction lifecycle.
  • Administer and track technical submittals, shop drawings, product data, samples, RFIs, revisions, approvals, and outstanding actions.
  • Develop and maintain turnover and closeout documentation trackers while identifying documentation gaps and turnover risks.
  • Review, validate, and manage O&M manuals, as-built drawings, commissioning records, warranties, training records, and other turnover-critical documentation.
  • Perform quality-control reviews to ensure documentation is complete, accurate, properly classified, audit-ready, and compliant with project requirements.


What's Needed?

  • 5+ years of experience in Construction Document Control and Electronic Document Management Systems such as Procore, ProjectSight, SharePoint, or Common Data Environments (CDEs).
  • 3+ years of experience managing turnover packages, O&M manuals, as-built drawings, commissioning records, warranties, training documentation, and closeout deliverables.
  • 3+ years of experience working with construction drawings, specifications, RFIs, submittals, change orders, document registers, and project trackers.
  • Strong Excel and document tracking capabilities with experience using Microsoft Excel, Word, Outlook, Teams, and PowerPoint.
  • Ability to interpret construction specifications, coordinate across multiple stakeholders, identify documentation gaps, and maintain revision/version control.


What's in it for me?

  • Support the delivery of large-scale, mission-critical data center projects for a leading global technology client.
  • Gain exposure to the full project lifecycle, including design, construction, commissioning, closeout, and operations transition.
  • Work closely with Construction Managers, Project Engineers, Commissioning Teams, Contractors, Designers, Vendors, and Operations.
  • Develop expertise in industry-leading document management systems, Common Data Environments (CDEs), and turnover processes.
  • Contribute directly to project success by improving turnover readiness and supporting successful operational handover.

 

If this is a role that interests you and you’d like to learn more, click apply now and a recruiter will be in touch with you to discuss this great opportunity. We look forward to speaking with you!

 

About ManpowerGroup, Parent Company of: Manpower, Experis and Talent Solutions

Experis® is a global leader in technology services and part of the ManpowerGroup® (NYSE: MAN) family of brands. We connect skilled technology professionals with meaningful opportunities where they can grow their careers, expand their expertise and make a real impact. Guided by the belief that it takes Human Ingenuity to unlock the true potential of technology, Experis helps people gain experience with leading organizations, build sought-after skills and take the next step toward a brighter future. Backed by ManpowerGroup's 75+ years of workforce expertise and global reach across more than 70 countries and territories, Experis brings the scale, insight and opportunity to help people and businesses thrive. ManpowerGroup is consistently recognized for its commitment to inclusion, ethics and responsible business, including being named one of the World's Most Ethical Companies. Learn more at Experis.com.

Job Tags

Temporary work, For contractors, For subcontractor

Similar Jobs

Southeast Community College (Lincoln, NE)

Senior Classroom Aide - Early Childhood (Part-Time) Job at Southeast Community College (Lincoln, NE)

 ...A regional educational institution in Oklahoma seeks a Lead Aide for the Child Development Center. This part-time role involves assisting the Group Supervisor in fostering a successful learning environment for children. Candidates should have experience working with children... 

Bakerly Barn LLC

Instrument and Controls Technician Job at Bakerly Barn LLC

Description: We are looking for a technician with at least five years of industrial maintenance experience involving electrical systems and automation controls. The candidate can read electrical schematics and PLC logic, troubleshoot PLC-controlled equipment and HMIs,... 

Wounded Warrior Project

Graphic Designer Job at Wounded Warrior Project

 ...that matters is just the beginning, so if youre ready to get started, were ready for you.The Wounded Warrior Project (WWP) Graphic Designer leads WWPs in-house graphic design capability within the marketing team. The Graphic Designer develops high-quality brand assets... 

Pharma Tech Concepts Llc

UPS STORE Manager Job at Pharma Tech Concepts Llc

 ...About Us We're a locally owned and operated franchise of The UPS Store a full-service retail center offering shipping, printing...  ...and resolve escalated issues Manage shipping services (UPS, freight, international) and packing standards Oversee print and finishing... 

SGS Consulting

Sterile Processing Technician Job at SGS Consulting

Job Responsibilities: ~ Min 1 year Experience as Sterile Processing Technician ; Skills: ~ Active Sterile Processing Technician certification need ; Education/Experience: ~ BLS , Covid, High school ;